Update on Casita Reno's



As you know, the last five weeks have involved extensive development of the adjoining building behind the main house. Before work began, the casita was basically a concrete block, steel edifice with very rough concrete on the walls and most of the floors. It was not wired properly but did have plumbing and water. For the most part, it was a garbage and dust collector . The plan is to have, on the ground floor, a second bathroom and shower, move the laundry from the main house and construct a kitchen/bbq area adjoining the back patio. The upstairs will consist of a lounge room with view and another bedroom/study. Well. the work is almost complete and things look great. Over the next little while, I will post some pictures of the progress.